How to Set Up Work Order Software: Moving from Paper Job Sheets to a Mobile App
A step-by-step guide to moving service requests from phone calls and messages, paper job sheets and technician tracking into one system: request channels, the work order form, technician app, SLAs, parts and preventive maintenance.
In brief: Work order software is set up in seven steps: (1) connect every request channel (phone, messaging, email, web form, QR code on equipment) to one intake point, (2) design the work order form (fault, asset, address, photos, parts, signature), (3) define dispatch rules (area, skill, workload), (4) give technicians a mobile app that works on weak connections, (5) set SLA times for contract customers, (6) link spare parts stock to work orders, (7) turn preventive maintenance into automatic work orders. Starting with a pilot team lowers risk. Aktaş Digital, a software development company based in Istanbul, Türkiye, builds custom field service and work order software and works with clients internationally, remotely and in English.
Last updated: 17 November 2026
Step 1: Unify request channels
A phone request shouldn't stay with the call desk, a message on one technician's phone and an email in another inbox. All should enter one system with one reference number. A QR code on the equipment lets customers open a request with asset details attached.
Step 2: Design the work order form
- Customer, address and contact
- Asset, brand, model, serial number, warranty status
- Fault description and priority
- Work done, parts used, labour time
- Before/after photos and customer signature
Step 3: Define dispatch rules
Automatic or semi-automatic assignment by area, skill and workload; priority rules for urgent jobs.
Step 4: Technician app
Technicians see their jobs, addresses and asset history on their phones and record photos, parts and signatures on site. Offline use with sync when the connection returns matters in basements and on sites.
Step 5: SLA times
Define response and resolution times for contract customers and get alerts for jobs nearing their deadline.
Step 6: Spare parts
When a technician adds a part to the work order, it is deducted from stock; van stock and warehouse stock are tracked separately.
Step 7: Preventive maintenance
Maintenance plans are defined for assets such as HVAC units, lifts or generators; due maintenance becomes a work order automatically and the customer is notified.
Rollout checklist
- Are all request channels connected to one intake point?
- Was the work order form tested with technicians?
- Did a pilot team use the system for 2–4 weeks?
- Were customers and assets imported?
- Are SLA times and alerts defined?
- Was parts stock verified with an opening count?
For pricing and selection criteria see field service management software cost.
Frequently Asked Questions
How do you set up work order software?
Unify request channels, design the work order form and dispatch rules, give technicians a mobile app, connect SLAs, parts and preventive maintenance, and start with a pilot team.
Can technicians work offline?
The app can be designed to work offline; records sync when the connection returns.
Can field service be managed in spreadsheets?
For a small start with few requests, yes; it falls short when you need mobile work orders, signatures, SLAs and parts tracking.
Conclusion
Moving from paper to mobile succeeds with one request intake, a well-designed work order form and a technician app that is actually used in the field. See our service page or fill in the quote form.
